Call now to purchase or lease an FGX Dry Coal Processing Plant +1-859-263-8300 fgx@fgxseptechllc.com

Lexington, KY. —- FGX SepTech, LLC has received a lot of inquries and requests for pilot-scale dry coal processing tests.  The mobile FGX dry coal processing test unit that FGX SepTech owns is in kept in Nicholasville, Ky.  Tests can be done either in Nicholasville or at mine sites designated by interested clients.  Below are suggested requirements for pilot-scale FGX test,

  1. Particle size: minus 2.5″.  To get better separation performance, the amount of fines (minus 0.25″) shall be less than 20%.
  2. Amount of material needed: around 3 tons;
  3. Surface moisture of ROM shall be less than 9%;
  4. 480 V, 60 A, three phase power source needed;
  5. Interested clients are encouraged to provide their coal washability data and particle size info. to FGX SepTech prior to pilot-scale testing.

2011374149028546

FGX SepTech, LLC is a dry coal processing and coal deshaling solution provider based in Lexington, Kentucky.  Committed to serving the coal industry, we at FGX SepTech are ready to work with you to address your needs for dry coal processing and deshaling.  To schedule an FGX dry coal processing test, please contact FGX SepTech at 859-519-0344 or email at fgx@fgxseptechllc.com